Building works on weak ground, large scale, as well as the urban underground work often used pile foundation. Accordingly geological survey works - works to serve the design and construction of pile foundation is essential. Resource base required to compile geological survey - works in standards: 205: 1998 pile foundation-specifications for design and 10304: 2014 pile foundation-design standard is standard 2.02.03-85 pile foundation and "Code 24.13330.2011 pile foundation" of Russia. However, these standards have many different points and there are several issues to consider further when applying. On the other geological survey works - works in service design, pile foundation construction for high-rise buildings with basements, the urban underground, the large-scale construction projects in the district cramped area there are unique characteristics that should be considered in the standardization of pile foundation.